The Peugeot has had the braze-ons removed, and is ready to be stripped and re-sprayed.
The gear shifter bosses have been carefully ground away. Some work with wet and dry is needed to get rid of the file marks.
The bottle cage mounts have also been removed and need to be filled before the frame is primed.
No comments:
Post a Comment